railroad-crossings

August 13, 2013 – US 40 Railroad Crossing Update

Written on: August 13th, 2013 in Railroad CrossingsRoute 40

Crews prepared the curb area for concrete

Crews prepared the curb area for concrete

On August 12, Mumford & Miller continued working between train traffic to:

Completely excavate the roadway box on both east and west sides of US40

Other work included:  continuing prep work for curb, gutter and sidewalk installation on the westbound lanes, west of the tracks, and placing base asphalt patching between the newly installed curb line and the roadway on the east side of the tracks.

Norfolk Southern has begun rail replacement work.  Work is progressing well.

 





+