Elkton Road Project Update

April 17th, 2012

Road excavation and GABC stone base placement will occur between Lincoln Dr and Veterans Dr with flagger controlled intermittent lane closures, as needed. Drainage pipe installation will continue between Veterans Dr and Apple Rd with intermittent lane closures. Fine grading of GABC stone base will occur between Casho Mill Rd and Lincoln Dr, no lane restrictions expected. Apple Rd southbound will be closed for road widening and reconstruction and is scheduled to be reopened by May 18th.