August 21, 2017

The contractor, Mumford & Miller Inc., will continue placing fill for widening I-95 northbound acceleration lane from SR 141. They are working on installing utility infrastructure through the SR 141 and I-95 northbound corridor. The contractor is reconstructing the ramp for Exit 3A, northbound SR141 to northbound I-95 with pavement, curb, guardrail, and barrier. The contractor has begun clearing vegetation on SR 141 southbound on the closed side of the roadway. They are demolishing existing SR 141 southbound bridge and constructing foundations for the new bridge. They are pouring concrete curb on SR141 northbound.

LANE CLOSURES:

Motorists should expect traffic on SR141 southbound and northbound to be reduced to one lane in the construction area during the hours of 9AM to 3PM, Monday thru Friday.

Ramp Exit 5B (NB I-295 to NB SR141/Newport) remains closed until late October 2017. Motorists traveling northbound SR141/Newport should use Exit 5.