Facebook Twitter Flickr YouTube RSS Feed
Written on: June 17th, 2016 in Route 26
Below is an outline of the anticipated construction schedule and associated lane closures for
work on the SR 26 Mainline Improvement Project during the next week.
Monday, June 13, 2016 through Thursday, June 16, 2016 – Day Shift
Continue placing concrete for new curb on Route 26 at Powell Farm Road. Motorists should
anticipate eastbound or westbound shifts on Route 26 at Powell Farm Road with both lanes
getting through the work zone utilizing a flagging operation by construction personnel from
07:00AM to 5:00PM.
Continue wedge and leveling on Route 26 between Roxana Road and Powell Farm Road.
Motorists should anticipate lane shifts along Route 26 in this corridor with both travel lanes
getting through the work zone utilizing a flagging operation by construction personnel from
07:00AM to 5:00PM.
Continue paving driveway entrances along Route 26 between Railway Road and Powell Farm
Road. Motorists should anticipate lane shifts along Route 26 in this corridor with both travel
lanes getting through the work zone utilizing a flagging operation by construction personnel
from 07:00AM to 5:00PM.
Thursday, June 16, 2016 – Night Shift
Continue wedge and leveling on Route 26 between Cedar Drive and Roxana Road. Motorists
should anticipate eastbound and westbound lane closures along Route 26 in this corridor with
traffic alternating through the work zone utilizing a flagging operation by Law Enforcement and
construction personnel from 9:00PM to 8:00AM.