Facebook Twitter Flickr YouTube RSS Feed
Written on: November 3rd, 2014 in Route 26
Monday, November 3, 2014 through Friday November 7, 2014
Continue installation of the new sanitary sewer line along Route 26 between Powell Farm Road and
Route 17 (Roxana Road). Motorists should anticipate eastbound or westbound lane closures on Route
26 between Powell Farm Road and Route 17 (Roxana Road) with traffic alternating through the
work zone utilizing a flagging operation by construction personnel from 09:00 a.m. to 7:00 p.m.
Complete placement of new asphalt pavement between the new curb and gutter and the new
roadway surface. Complete grading for new sidewalk. Motorists should anticipate eastbound
and westbound lane shifts on Route 26 between Old Mill Road and Grants Avenue from 07:00 a.m.
to 7:00 p.m.
Complete placement of new asphalt pavement between the new curb and gutter and the new
roadway surface. Motorists should anticipate eastbound and westbound lane shifts on Route 26
between West Avenue and Woodland Avenue from 07:00 a.m. to 7:00 p.m.
Complete placement of new asphalt pavement between the new curb and gutter and the new
roadway surface. Motorists should anticipate the southbound lane on Central Avenue to be
closed between Route 26 and Woodland Avenue with traffic alternating through the work zone
utilizing a flagging operation by construction personnel from 07:00 a.m. to 7:00 p.m.
………………………………….
Travel times to and from your destination may be quicker if you use one of the Route 26 Alternate Routes that were constructed prior to the start of the Route 26 Mainline Construction Project. The recently reconstructed roadways include:
• Burbage Road, from Route 17 to Windmill Drive
• Windmill Drive to Route 26 to Central Avenue
• Central Avenue, from Windmill Drive to Beaver Dam Road
• Beaver Dam Road, from Central Avenue to Muddy Neck Road