Written on: November 21st, 2014 in Route 26
Monday, November 24, 2014 through Tuesday November 25, 2014
Continue installation of the new sanitary sewer line along Route 26 at Route 17 (Roxana Road). Motorists
should anticipate eastbound or westbound lane closures on Route 26 at Route 17 (Roxana Road) with traffic
alternating through the work zone utilizing a flagging operation by law enforcement and construction
personnel between 09:00 a.m. to 5:00 p.m.
Continue install new drainage pipe and associated drainage inlets along Route 26 between Railway Road
and Clubhouse Road. Motorists should anticipate eastbound or westbound lane closures on Route 26
between Railway Road and Clubhouse Road with traffic alternating through the work zone utilizing a
flagging operation by construction personnel between 9:00 a.m. and 5:00 p.m.
Continue installation of electrical conduits and junction boxes at Central Avenue and Route 26. No lane
closures are anticipated for this work.
Continue grading for sidewalk between Woodland Avenue and West Avenue. Motorists should
anticipate eastbound and westbound lane shifts on Route 26 between Woodland Avenue and West
Avenue between 07:00 a.m. to 5:00 p.m.
Wednesday, November 26, 2014
No lane closures anticipated on this day. All construction activities are scheduled to be performed
outside of the roadway.
………………………………
Travel times to and from your destination may be quicker if you use one of the Route 26 Alternate Routes that were constructed prior to the start of the Route 26 Mainline Construction Project. The recently reconstructed roadways include:
• Burbage Road, from Route 17 to Windmill Drive
• Windmill Drive to Route 26 to Central Avenue
• Central Avenue, from Windmill Drive to Beaver Dam Road
• Beaver Dam Road, from Central Avenue to Muddy Neck Road
For more information on the Alternate Route Project, visit our website at https://deldot.gov/information/projects/sr26
Written on: November 17th, 2014 in Route 26
Monday, November 17, 2014 through Friday November 21, 2014
Continue installation of the new sanitary sewer line along Route 26 at Route 17 (Roxana Road).
Motorists should anticipate eastbound or westbound lane closures on Route 26 at Route 17 (Roxana
Road) with traffic alternating through the work zone utilizing a flagging operation by law
enforcement and construction personnel between 09:00 a.m. to 5:00 p.m.
Install new drainage pipe and associated drainage inlets along Route 26 between Railway Road and
Clubhouse Road. Motorists should anticipate eastbound or westbound lane closures on Route 26
between Railway Road and Clubhouse Road with traffic alternating through the work zone
utilizing a flagging operation by construction personnel between 9:00 a.m. and 5:00 p.m.
Continue installation of electrical conduits and junction boxes at Central Avenue and Route 26. No
lane closures are anticipated for this work.
Continue placing topsoil behind curb between Woodland Avenue and West Avenue. Motorists
should anticipate eastbound and westbound lane shifts on Route 26 between Woodland Avenue and
West Avenue between 07:00 a.m. to 5:00 p.m.
…………………………………..
Travel times to and from your destination may be quicker if you use one of the Route 26 Alternate Routes that were constructed prior to the start of the Route 26 Mainline Construction Project. The recently reconstructed roadways include:
• Burbage Road, from Route 17 to Windmill Drive
• Windmill Drive to Route 26 to Central Avenue
• Central Avenue, from Windmill Drive to Beaver Dam Road
• Beaver Dam Road, from Central Avenue to Muddy Neck Road
For more information on the Alternate Route Project, visit our website at https://deldot.gov/information/projects/sr26
Written on: November 6th, 2014 in Route 26
Monday, November 10, 2014 through Friday November 14, 2014
Continue installation of the new sanitary sewer line along Route 26 between Powell Farm Road and
Route 17 (Roxana Road). Motorists should anticipate eastbound or westbound lane closures on Route
26 between Powell Farm Road and Route 17 (Roxana Road) with traffic alternating through the
work zone utilizing a flagging operation by construction personnel from 09:00 a.m. to 5:00 p.m.
Install new drainage pipe and associated drainage inlets along eastbound Route 26 at Clubhouse
Road. Motorists should anticipate eastbound or westbound lane closures on Route 26 between
Windmill Drive and Clubhouse Road with traffic alternating through the work zone utilizing a
flagging operation by construction personnel between 9:00 a.m. and 5:00 p.m.
Continue installation of electrical conduits and junction boxes at Old Mill Road and Route 26. No
lane closures are anticipated for this work.
Continue grading for sidewalk between Old Mill Road and Cedar Drive. Motorists should
anticipate eastbound and westbound lane shifts on Route 26 between Old Mill Road and Cedar
Drive from 07:00 a.m. to 5:00 p.m.
Continue placing topsoil behind curb between Woodland Avenue and West Avenue. Motorists
should anticipate eastbound and westbound lane shifts on Route 26 between Woodland Avenue and
West Avenue from 07:00 a.m. to 5:00 p.m.
………………………………………
Travel times to and from your destination may be quicker if you use one of the Route 26 Alternate Routes that were constructed prior to the start of the Route 26 Mainline Construction Project. The recently reconstructed roadways include:
• Burbage Road, from Route 17 to Windmill Drive
• Windmill Drive to Route 26 to Central Avenue
• Central Avenue, from Windmill Drive to Beaver Dam Road
• Beaver Dam Road, from Central Avenue to Muddy Neck Road
For more information on the Alternate Route Project, visit our website at https://deldot.gov/information/projects/sr26
Written on: November 3rd, 2014 in Route 26
Monday, November 3, 2014 through Friday November 7, 2014
Continue installation of the new sanitary sewer line along Route 26 between Powell Farm Road and
Route 17 (Roxana Road). Motorists should anticipate eastbound or westbound lane closures on Route
26 between Powell Farm Road and Route 17 (Roxana Road) with traffic alternating through the
work zone utilizing a flagging operation by construction personnel from 09:00 a.m. to 7:00 p.m.
Complete placement of new asphalt pavement between the new curb and gutter and the new
roadway surface. Complete grading for new sidewalk. Motorists should anticipate eastbound
and westbound lane shifts on Route 26 between Old Mill Road and Grants Avenue from 07:00 a.m.
to 7:00 p.m.
Complete placement of new asphalt pavement between the new curb and gutter and the new
roadway surface. Motorists should anticipate eastbound and westbound lane shifts on Route 26
between West Avenue and Woodland Avenue from 07:00 a.m. to 7:00 p.m.
Complete placement of new asphalt pavement between the new curb and gutter and the new
roadway surface. Motorists should anticipate the southbound lane on Central Avenue to be
closed between Route 26 and Woodland Avenue with traffic alternating through the work zone
utilizing a flagging operation by construction personnel from 07:00 a.m. to 7:00 p.m.
………………………………….
Travel times to and from your destination may be quicker if you use one of the Route 26 Alternate Routes that were constructed prior to the start of the Route 26 Mainline Construction Project. The recently reconstructed roadways include:
• Burbage Road, from Route 17 to Windmill Drive
• Windmill Drive to Route 26 to Central Avenue
• Central Avenue, from Windmill Drive to Beaver Dam Road
• Beaver Dam Road, from Central Avenue to Muddy Neck Road