DelDOT logo
DelDOT Blog


Delaware Department of Transportation


Facebook  Twitter  Flickr  YouTube  RSS Feed

  Archived Posts From: 2014

route-26

Additional lane closures that will take place at night this week

Written on: October 20th, 2014 in Route 26

Monday, October 20, 2014 through Tuesday, October 21, 2014

Begin saw cutting the existing roadway for installation of new roadway drainage pipes. Motorists should anticipate eastbound or westbound lane closures on Route 26 between Powell Farm Road and Route 17 (Roxana Road) with traffic alternating through the work zone utilizing a flagging operation by construction personnel between 7:00 p.m. and 06:00 a.m.

Wednesday, October 22, 2014 through Thursday, October 23, 2014

Continue saw cutting the existing roadway for installation of new roadway drainage pipes. Motorists should anticipate eastbound or westbound lane closures on Route 26 between Route 17 (Roxana Road) and Clubhouse Road with traffic alternating through the work zone utilizing a flagging operation by construction personnel between 7:00 p.m. and 06:00 a.m.


route-26

Anticipated construction schedule and associated lane closures for work on the Route 26 Widening Project during this week

Written on: October 20th, 2014 in Route 26

Monday, October 20, 2014 through Friday October 24, 2014

Continue installation of the new sanitary sewer line along Route 26 between Powell Farm Road and
Route 17 (Roxana Road). Motorists should anticipate eastbound or westbound lane closures on Route
26 between Powell Farm Road and Route 17 (Roxana Road) with traffic alternating through the
work zone utilizing a flagging operation by construction personnel between 09:00 a.m. and
7:00 p.m.

Begin placement of new asphalt pavement between the new curb and gutter and the new
roadway surface. Motorists should anticipate eastbound or westbound lane closures on Route 26
between Old Mill Road and Grants Avenue traffic alternating through the work zone utilizing a
flagging operation between 09:00 a.m. and 7:00 p.m.

Continue placement of new asphalt pavement between the new curb and gutter and the new
roadway surface. Begin grading for new sidewalk. Motorists should anticipate eastbound or
westbound lane closures or lane shifts on Route 26 between West Avenue and Woodland Avenue
with traffic alternating through the work zone utilizing a flagging operation between 09:00 a.m.
and 7:00 p.m.





+