Sunday August 17, 2014 through Friday August 22, 2014

Begin milling and paving at Cedar Drive and Route 26. Motorists should anticipate lane closures
on Cedar Drive and Route 26 with traffic alternating through the intersection utilizing a flagging
operation by law enforcement and construction personnel between 8:00 p.m. and 07:00 a.m.

Begin milling and paving at Old Mill Road and Route 26. Motorists should anticipate lane closures
on Old Mill Road and Route 26 with traffic alternating through the intersection utilizing a flagging
operation by law enforcement and construction personnel between 8:00 p.m. and 07:00 a.m.

Begin grading for curb and gutter between Woodland Avenue and Central Avenue. Motorists
should anticipate eastbound or westbound lane closures on Route 26 between West Avenue and
Woodland Ave with traffic alternating through the work zone utilizing a flagging operation as
well as lane closures on Central Avenue at Route 26 with traffic alternating through the intersection
utilizing a flagging operation by law enforcement and construction personnel on Sunday between
10:30 p.m. and 07:00 a.m. and Monday through Thursday between 8:00 p.m. and 07:00 a.m.

Continue installation of sanitary sewer line along Route 26 between Irons Lane and Powell Farm
Road. No lane closures are anticipated for this construction activity.

Continue the installation of Tidewater Utilities, Inc. water line between Grants Avenue and Old
School Lane. Motorists should anticipate eastbound or westbound lane closures on Route 26
between Grants Avenue and Old School Lane with traffic alternating through the work zone
utilizing a flagging operation between 8:00 p.m. and 07:00 a.m.




+