SR141/I-95 Project Update May 20, 2016

Written on: July 1st, 2016 in SR141

SR141/I-95 Ramp Interchange Project Update
May 20, 2016
Mumford & Miller Concrete, Inc. continues the clearing of 141 southbound in preparation for the widening of the bridge over I-95 northbound. They will be driving test piles. Delmarva continues to work on the temporary relocation of a gas main off of the SR141 northbound bridge over I-95 in preparation for widening of that bridge. During the evening hours, stripping will take place on I-95 and I-295 along with the filling of the rumble strips for the future crossover.
LANE CLOSURES:
Motorists should expect traffic on SR141 northbound and southbound to be reduced to one lane in the construction area during the hours of 9AM to 3PM, Monday thru Thursday.
There will be intermittent lane closures on SR141 and on northbound I-95/I-295 from 6PM to 5AM.
Motorists will no longer be able to make a left turn from northbound SR141 onto Airport Road.